Owner : Water Authority of Jordan.

Location : Libb village / Madaba district.

Commissioning date : 1994

Project value : 10 million JD.

Project description:

To pump fresh water from Libb reservoir (6000m³) to National park reservoir (6000m³),

around 32km far from Libb at a flow rate of 2400m³ /h.

Equipment and scope:

- 5 Pumps, 1100KW, 400VAC each, starting method is Auto-transformer starters.

- 5 Power transformers, 2000KVA, 33/0.4 kV each, with 3200A, 4Pole incoming

withdrawable ACB’s.

- 2 Diesel generating sets, 1600KVA, 1200KW, 400V, 50Hz /each.

- 3 Low voltage Main distribution and starter panels (Auto-transformer starters).

- 1 Automatic synchronizing panel for the stand-by emergency generators.

- 1 PLC based remote control and mimic panel with power management and provision for

Telemetry interface.

- 1 Hydraulic surge protection system.

- 1 Electromagnetic Flow-meter, ND 800.

- 1 Chlorination system.

- Set of Ultra - sonic level transmitters, Pressure transmitters and flow transmitters.

Scope:

supply, design, assembly, testing, installation, training of operational staff and

commissioning of the low voltage systems complete, including; Main distribution and

starters panels, remote control and mimic