| 1994 Wala Water Project- Libb Pumping Station |
|
|
|
Owner : Water Authority of Jordan. Location : Libb village / Madaba district. Commissioning date : 1994 Project value : 10 million JD. Project description: To pump fresh water from Libb reservoir (6000m³) to National park reservoir (6000m³), around 32km far from Libb at a flow rate of 2400m³ /h. Equipment and scope: - 5 Pumps, 1100KW, 400VAC each, starting method is Auto-transformer starters. - 5 Power transformers, 2000KVA, 33/0.4 kV each, with 3200A, 4Pole incoming withdrawable ACB’s. - 2 Diesel generating sets, 1600KVA, 1200KW, 400V, 50Hz /each. - 3 Low voltage Main distribution and starter panels (Auto-transformer starters). - 1 Automatic synchronizing panel for the stand-by emergency generators. - 1 PLC based remote control and mimic panel with power management and provision for Telemetry interface. - 1 Hydraulic surge protection system. - 1 Electromagnetic Flow-meter, ND 800. - 1 Chlorination system. - Set of Ultra - sonic level transmitters, Pressure transmitters and flow transmitters. Scope: supply, design, assembly, testing, installation, training of operational staff and commissioning of the low voltage systems complete, including; Main distribution and starters panels, remote control and mimic |