| 1996 Al-Keena Hygienic Paper Mill |
|
|
|
Owner : Nuqul group. Location : East Irenbeh (South of Queen Alia International Airport). Commissioning date : 1995/ 1996. Project value : USD 33 million. Project description: Production of Hygienic paper in multi-ply rolls from raw pulp material. Equipment and scope: - 1 MV substation, 33KV. - 1 Automation and visualization system (DCS control system) consisting off: - 5 operator workstations - 12 PLC based outstation/ distributed control panels to cover the control and monitoring of around 9600 I/Os. - 1 Generators, 450KW, 400V, 50Hz. - 2 Transformers, 2500KVA, 33/0.4KV /each . - 1 Transformer, 2000KVA, 33/0.4KV. - 2 Transformers, 2500KVA, 33/0.69KV /each . - 2 Withdrawable type distribution panels & MCC panels, 400V. - 2 Withdrawable type distribution panels & MCC panels, 690V. - 89 AC motors and variable speed drives, ratings up to 450KW. - 3 Panels for AC drives (inverters) up to 450KW (20 motors). - 1 UPS system. - Set of instruments for flow, pressure, turbidity, conductivity, PH-value, Temp. and level. - Set of pneumatically and electrically operated control valves. - Set of cable ladders, trays and accessories (approximately 6000m). - Comprehensive earthing system. - Cabling system for power, control, Automation, and signaling including fiber optic cables (total of around 140 Km) . Scope : - Installation, testing, cold and hot commissioning and optimization of all of the above items. - Alignment of motors couplings. |